DATE |
SUBJECT |
|
31-08-2010 |
Announcement for the Increase of NTC value for the period 06 – 12 September 2010 for the interconnection with FYROM
---------------------------------------------
In accordance with the new calculations of the NTC between MEPSO and HTSO, its value for the direction MEPSO to HTSO in the period 06 – 12 September 2010 is increased by 100 MW.
50% of this quantity (50 MW) will be allocated by HTSO on daily auctions in accordance with HTSO auction rules. |
|
25-08-2010 |
Announcement for the Increase of NTC value for the period 01 – 05 September 2010 for the interconnection with FYROM
---------------------------------------------
In accordance with the new calculations of the NTC between MEPSO and HTSO, its value for the direction MEPSO to HTSO in the period 01 – 05 September 2010 is increased by 220 MW.
50% of this quantity (110 MW) will be allocated by HTSO on daily auctions in accordance with HTSO auction rules. |
|
19-08-2010 |
Announcement of Monthly Auction of August 2010 for the allocation of Physical Transmission Rights for exports at the interconnections of Albania, FYROM, and Bulgaria for the time interval from 00:00 CET of 01-09-2010 until 24:00 CET of 30-09-2010.
More >> |
|
19-08-2010 |
Announcement of Monthly Auction of August 2010 for the allocation of Physical Transmission Rights for imports at the interconnections of FYROM and Bulgaria for the time interval from 00:00 CET of 01-09-2010 until 24:00 CET of 30-09-2010.
More >> |
|
19-08-2010 |
LIST OF REGISTERED INTERCONNECTION USERS ACCORDING TO THE PARTICIPATION REQUIREMENTS OF THE 2010 CAPACITY ALLOCATION AUCTION RULES.
More >> |
|
18-08-2010 |
LIST OF ELIGIBLE USERS ACCORDING TO THE PARTICIPATION REQUIREMENTS OF THE 2010 CAPACITY ALLOCATION AUCTION RULES.
More >> |
|
17-08-2010 |
Announcement for the Increase of NTC value for the period 23 – 31 August 2010 for the interconnection with FYROM
---------------------------------------------
In accordance with the new calculations of the NTC between MEPSO and HTSO, its value for the direction MEPSO to HTSO in the period 23 – 31 August 2010 is increased by 200 MW.
50% of this quantity (100 MW) will be allocated by HTSO on daily auctions in accordance with HTSO auction rules. |
|
10-08-2010 |
Announcement for the Increase of NTC value for the period 16 – 22 August 2010 for the interconnection with FYROM
---------------------------------------------
In accordance with the new calculations of the NTC between MEPSO and HTSO, its value for the direction MEPSO to HTSO in the period 16 – 22 August 2010 is increased by 120 MW.
50% of this quantity (60 MW) will be allocated by HTSO on daily auctions in accordance with HTSO auction rules. |
|
03-08-2010 |
Announcement for the Increase of NTC value for the period 09 – 15 August 2010 for the interconnection with FYROM
---------------------------------------------
In accordance with the new calculations of the NTC between MEPSO and HTSO, its value for the direction MEPSO to HTSO in the period 09 – 15 August 2010 is increased by 150 MW.
50% of this quantity (75 MW) will be allocated by HTSO on daily auctions in accordance with HTSO auction rules. |
|
27-07-2010 |
Announcement for the Increase of NTC value for the period 01 – 08 August 2010 for the interconnection with FYROM
---------------------------------------------
In accordance with the new calculations of the NTC between MEPSO and HTSO, its value for the direction MEPSO to HTSO in the period 01 – 08 August 2010 is increased by 210 MW.
50% of this quantity (105 MW) will be allocated by HTSO on daily auctions in accordance with HTSO auction rules. |
|
20-07-2010 |
Announcement of Monthly Auction of August 2010 for the allocation of Physical Transmission Rights for exports at the interconnections of Albania, FYROM,Bulgaria and Italy for the time interval from 00:00 CET of 01-08-2010 until 24:00 CET of 31-08-2010.
More >> |
|
20-07-2010 |
Announcement of Monthly Auction of August 2010 for the allocation of Physical Transmission Rights for imports at the interconnections of FYROM and Bulgaria for the time interval from 00:00 CET of 01-08-2010 until 24:00 CET of 31-08-2010.
More >> |
|
20-07-2010 |
Announcement for the Increase of NTC value for the period 26 – 31 July 2010 for the interconnection with FYROM
---------------------------------------------
In accordance with the new calculations of the NTC between MEPSO and HTSO, its value for the direction MEPSO to HTSO in the period 26 – 31 July 2010 is increased by 200 MW.
50% of this quantity (100 MW) will be allocated by HTSO on daily auctions in accordance with HTSO auction rules.
|
|
19-07-2010 |
LIST OF REGISTERED INTERCONNECTION USERS ACCORDING TO THE PARTICIPATION REQUIREMENTS OF THE 2010 CAPACITY ALLOCATION AUCTION RULES.
More >> |
|
19-07-2010 |
LIST OF ELIGIBLE USERS ACCORDING TO THE PARTICIPATION REQUIREMENTS OF THE 2010 CAPACITY ALLOCATION AUCTION RULES.
More >> |
|
13-07-2010 |
Announcement for the Increase of NTC value for the period 19 – 25 July 2010 for the interconnection with FYROM
---------------------------------------------
In accordance with the new calculations of the NTC between MEPSO and HTSO, its value for the direction MEPSO to HTSO in the period 19 – 25 July 2010 is increased by 200 MW.
50% of this quantity (100 MW) will be allocated by HTSO on daily auctions in accordance with HTSO auction rules. |
|
06-07-2010 |
Announcement for the Increase of NTC value for the period 12 – 18 July 2010 for the interconnection with FYROM
---------------------------------------------
In accordance with the new calculations of the NTC between MEPSO and HTSO, its value for the direction MEPSO to HTSO in the period 12 – 18 July 2010 is increased by 200 MW.
50% of this quantity (100 MW) will be allocated by HTSO on daily auctions in accordance with HTSO auction rules. |
|
23-06-2010 |
Announcement for the Increase of NTC value for the period 01 – 11 July 2010 for the interconnection with FYROM
---------------------------------------------
In accordance with the new calculations of the NTC between MEPSO and HTSO, its value for the direction MEPSO to HTSO in the period 01 – 11 July 2010 is increased by 230 MW.
50% of this quantity (115 MW) will be allocated by HTSO on daily auctions in accordance with HTSO auction rules. |
|
18-06-2010 |
LIST OF REGISTERED INTERCONNECTION USERS ACCORDING TO THE PARTICIPATION REQUIREMENTS OF THE 2010 CAPACITY ALLOCATION AUCTION RULES.
More >> |
|
17-06-2010 |
Announcement of Monthly Auction of July 2010 for the allocation of Physical Transmission Rights for exports at the interconnections of FYROM and Albania for the time interval from 00:00 CET of 01-07-2010 until 24:00 CET of 31-07-2010.
More >> |
|
17-06-2010 |
Announcement of Monthly Auction of July 2010 for the allocation of Physical Transmission Rights for imports at the interconnections of Albania, FYROM and Bulgaria for the time interval from 00:00 CET of 01-07-2010 until 24:00 CET of 31-07-2010.
More >> |
|
17-06-2010 |
LIST OF ELIGIBLE USERS ACCORDING TO THE PARTICIPATION REQUIREMENTS OF THE 2010 CAPACITY ALLOCATION AUCTION RULES.
More >> |
|
09-06-2010 |
Trial parallel operation of Turkish TSO TEIAS planned to start in September 2010
---------------------------------------------
More >> |
|
07-06-2010 |
Announcement for the Increase of NTC value for the period 14 – 20 June 2010 for the interconnection with FYROM
---------------------------------------------
In accordance with the new calculations of the NTC between MEPSO and HTSO, its value for the direction MEPSO to HTSO in the period 14 – 20 June 2010 is increased by 220 MW.
50% of this quantity (110 MW) will be allocated by HTSO on daily auctions in accordance with HTSO auction rules. |
|
31-05-2010 |
Announcement for the Increase of NTC value for the period 07 – 13 June 2010 for the interconnection with FYROM
---------------------------------------------
In accordance with the new calculations of the NTC between MEPSO and HTSO, its value for the direction MEPSO to HTSO in the period 07 – 13 June 2010 is increased by 220 MW.
50% of this quantity (110 MW) will be allocated by HTSO on daily auctions in accordance with HTSO auction rules. |
|
27-05-2010 |
Announcement for the Increase of NTC value for the period 01 – 06 June 2010 for the interconnection with FYROM
---------------------------------------------
In accordance with the new calculations of the NTC between MEPSO and HTSO, its value for the direction MEPSO to HTSO in the period 01 – 06 June 2010 is increased by 200 MW.
50% of this quantity (100 MW) will be allocated by HTSO on daily auctions in accordance with HTSO auction rules. |
|
19-05-2010 |
Announcement of Monthly Auction of June 2010 for the allocation of Physical Transmission Rights for exports at the interconnections of FYROM and Albania for the time interval from 00:00 CET of 01-06-2010 until 24:00 CET of 30-06-2010.
More >> |
|
19-05-2010 |
Announcement of Monthly Auction of June 2010 for the allocation of Physical Transmission Rights for imports at the interconnections of Albania, FYROM and Bulgaria for the time interval from 00:00 CET of 01-06-2010 until 24:00 CET of 30-06-2010.
More >> |
|
18-05-2010 |
LIST OF REGISTERED INTERCONNECTION USERS ACCORDING TO THE PARTICIPATION REQUIREMENTS OF THE 2010 CAPACITY ALLOCATION AUCTION RULES.
More >> |
|
18-05-2010 |
Announcement for the Increase of NTC value for the period 22 – 31 May 2010 for the interconnection with FYROM
---------------------------------------------
In accordance with the new calculations of the NTC between MEPSO and HTSO, its value for the direction MEPSO to HTSO in the period 22 – 31 May 2010 is increased by 120 MW.
50% of this quantity (60 MW) will be allocated by HTSO on daily auctions in accordance with HTSO auction rules. |
|
17-05-2010 |
LIST OF ELIGIBLE USERS ACCORDING TO THE PARTICIPATION REQUIREMENTS OF THE 2010 CAPACITY ALLOCATION AUCTION RULES.
More >> |
|
04-05-2010 |
Announcement for the Increase of NTC value for the period 14 – 21 May 2010 for the interconnection with Bulgaria
---------------------------------------------
In accordance with the new calculations of the NTC, its value is increased by 700 MW for the period 14 - 21 May 2010 ,daily, between 17:00 CET and 07:00 CET in the direction ESO – HTSO and 100 MW in the direction HTSO – ESO for the same time period.
50% of the above mentioned quantities will be allocated by HTSO on daily auctions in accordance with HTSO auction rules. |
|
04-05-2010 |
Announcement for the Increase of NTC value for the period 10 – 21 May 2010 for the interconnection with FYROM
---------------------------------------------
In accordance with the new calculations of the NTC between MEPSO and HTSO, its value for the direction MEPSO to HTSO in the period 10 – 21 May 2010 is increased by 160 MW.
50% of this quantity (80 MW) will be allocated by HTSO on daily auctions in accordance with HTSO auction rules. |
|
26-04-2010 |
Announcement for the Increase of NTC value for the period 01 – 09 May 2010 for the interconnection with FYROM
---------------------------------------------
In accordance with the new calculations of the NTC between MEPSO and HTSO, its value for the direction MEPSO to HTSO in the period 01 – 09 May 2010 is increased by 100 MW.
50% of this quantity (50 MW) will be allocated by HTSO on daily auctions in accordance with HTSO auction rules. |
|
19-04-2010 |
Announcement of Monthly Auction of May 2010 for the allocation of Physical Transmission Rights for exports at the interconnections of FYROM and Italy for the time interval from 00:00 CET of 01-05-2010 until 24:00 CET of 31-05-2010.
More >> |
|
19-04-2010 |
Announcement of Monthly Auction of May 2010 for the allocation of Physical Transmission Rights for imports at the interconnections of Albania, FYROM and Bulgaria for the time interval from 00:00 CET of 01-05-2010 until 24:00 CET of 31-05-2010.
More >> |
|
13-04-2010 |
Announcement for the Increase of NTC value for the period 19 – 30 April 2010 for the interconnection with FYROM
---------------------------------------------
In accordance with the new calculations of the NTC between MEPSO and HTSO, its value for the direction MEPSO to HTSO in the period 19 – 30 April 2010 is increased by 50 MW.
50% of this quantity (25 MW) will be allocated by HTSO on daily auctions in accordance with HTSO auction rules. |
|
12-04-2010 |
Announcement for the Increase of NTC value for the period 12 – 18 April 2010 for the interconnection with FYROM
---------------------------------------------
In accordance with the new calculations of the NTC between MEPSO and HTSO, its value for the direction MEPSO to HTSO in the period 12 – 18 April 2010 is increased by 40 MW.
50% of this quantity (20 MW) will be allocated by HTSO on daily auctions in accordance with HTSO auction rules. |
|
23-03-2010 |
Announcement for the Increase of NTC value for the period 01 – 11 April 2010 for the interconnection with FYROM
---------------------------------------------
In accordance with the new calculations of the NTC between MEPSO and HTSO, its value for the direction MEPSO to HTSO in the period 01 – 11 April 2010 is increased by 40 MW.
50% of this quantity (20 MW) will be allocated by HTSO on daily auctions in accordance with HTSO auction rules. |
|
17-03-2010 |
Announcement of Monthly Auction of April 2010 for the allocation of Physical Transmission Rights for exports at the interconnections of FYROM and Italy for the time interval from 00:00 CET of 01-04-2010 until 24:00 CET of 30-04-2010.
More >> |
|
17-03-2010 |
Announcement of Monthly Auction of April 2010 for the allocation of Physical Transmission Rights for imports at the interconnections of Albania, FYROM and Bulgaria for the time interval from 00:00 CET of 01-04-2010 until 24:00 CET of 30-04-2010.
More >> |
|
16-03-2010 |
POSTPONEMENT OF THE FIFTH REFERENCE DAY
According to the Ministerial Decision ÕÐÅÊÁ/Ä5/ÇË/Â/Ö.1.16/429/ïéê.4766/16-3-2010 the section A of the paragraph 1 of the article 320 of the Greek Grid and Exchange Code is amended as following:
The 3rd of May 2010 is defined as the Fifth Reference Day. |
|
11-03-2010 |
Information concerning imbalance fees in the Greek market that will be implemented after the 5th reference day of the Greek Code and some Market Management System Platform changes.
More >> |
|
10-03-2010 |
"HTSO informs market participants that on Wednesday 10/03/2010 the Market Management System (MMS - wholesale electricity market platform) will be upgraded. Therefore, starting from Wednesday 10/03/2010 16:00 Greek time and up to Wednesday 10/03/2010 21:00 Greek time the communication services provided by the MMS to the market participants will be temporally suspended. Specifically, internet access to the MMS market participant interface and the email communication with the market@desmie.gr account will not be available." |
|
02-03-2010 |
Announcement for the Increase of NTC value for the period 08 – 21 March 2010 and 27 – 31 March 2010 for the interconnection of Bulgaria - Greece
---------------------------------------------
According to the new calculations of the NTC for the direction ESO – HTSO, its value is increased by 200 MW for the period 08 – 21 March 2010 and 27 – 31 March 2010, excluding Sundays, only for the hours 08:00 – 21:00 CET.
50% of this quantity, 100 MW, will be allocated by HTSO via daily auctions in accordance with HTSO auction rules.
HTSO reserves the right to reduce the available daily capacity. |
|
22-02-2010 |
DAS Price correction for 21/02/2010
More >> |
|
22-02-2010 |
Announcement for the Increase of NTC value for the period 01 – 07 March 2010 on the interconnection of FYROM
---------------------------------------------
In accordance to the New calculations of the NTC for the direction MEPSO to HTSO its value is increased by 100 MW for the period 01 – 07 March 2010.
50% of this quantity (50 MW) will be allocated by HTSO on daily auctions in accordance with HTSO auction rules. |
|
18-02-2010 |
Revised Announcement of Monthly Auction of March 2010 for the allocation of Physical Transmission Rights for exports at the interconnections of FYROM and Italy for the time interval from 00:00 CET of 01-03-2010 until 24:00 CET of 31-03-2010
More >> |
|
17-02-2010 |
Announcement of Monthly Auction of March 2010 for the allocation of Physical Transmission Rights for exports at the interconnections of FYROM and Italy for the time interval from 00:00 CET of 01-03-2010 until 24:00 CET of 31-03-2010
More >> |
|
17-02-2010 |
Announcement of Monthly Auction of March 2010 for the allocation of Physical Transmission Rights for imports at the interconnections of Albania, Bulgaria and FYROM for the time interval from 00:00 CET of 01-03-2010 until 24:00 CET of 31-03-2010
More >> |
|
16-02-2010 |
Announcement for the Increase of NTC value for the period 22 – 28 February 2010 on the interconnection of FYROM
---------------------------------------------
In accordance to the New calculations of the NTC for the direction MEPSO to HTSO its value is increased by 100 MW for the period 22 – 28 February 2010.
50% of this quantity (50 MW) will be allocated by HTSO on daily auctions in accordance with HTSO auction rules. |
|
09-02-2010 |
Announcement for the Increase of NTC value for the period 15 – 21 February 2010 on the interconnection of FYROM
---------------------------------------------
In accordance to the New calculations of the NTC for the direction MEPSO to HTSO its value is increased by 100 MW for the period 15 – 21 February 2010.
50% of this quantity (50 MW) will be allocated by HTSO on daily auctions in accordance with HTSO auction rules. |
|
09-02-2010 |
Fifth Reference Day
More >> |
|
01-02-2010 |
Announcement for the Increase of NTC value for the period 08 – 14 February 2010 on the interconnection of FYROM
---------------------------------------------
In accordance to the New calculations of the NTC between MEPSO and HTSO, its value for the direction MEPSO to HTSO in the period 08 – 14 February 2010 is increased by 110 MW.
50% of this quantity (55 MW) will be allocated by HTSO on daily auctions in accordance with HTSO auction rules. |
|
26-01-2010 |
Announcement for the Increase of NTC value for the period 01 – 28 February 2010 on the interconnection of Albania
---------------------------------------------
In accordance to the New calculations of the NTC for the direction OST to HTSO its value is increased by 200 MW for the period 01 – 28 February 2010.
50% of this quantity 100 MW will be allocated by HTSO on daily auctions in accordance with HTSO auction rules. |
|
25-01-2010 |
Announcement for the Increase of NTC value for the period 01 – 07 February 2010 on the interconnection of FYROM
---------------------------------------------
In accordance to the New calculations of the NTC between MEPSO and HTSO, its value for the direction MEPSO to HTSO in the period 01 – 07 February 2010 is increased by 160 MW.
50% of this quantity (80 MW) will be allocated by HTSO on daily auctions in accordance with HTSO auction rules. |
|
19-01-2010 |
Announcement of Monthly Auction of February 2010 for the allocation of Physical Transmission Rights for exports at the Greek interconnections with Italy and FYROM for the time interval from 00:00 CET of 01-02-2010 until 24:00 CET of 31-12-2010.
More >> |
|
19-01-2010 |
Announcement of Monthly Auction of November 2009 for the allocation of Physical Transmission Rights for imports at the Greek interconnections with Bulgaria and FYROM for the time interval from 00:00 CET of 01-02-2010 until 24:00 CET of 28-02-2010.
More >> |
|
11-01-2010 |
Announcement for the Increase of NTC value for the period 18 – 24 January 2010 on the interconnection of FYROM
---------------------------------------------
In accordance to the New calculations of the NTC for the direction MEPSO to HTSO its value is increased by 120 MW for the period 18 – 24 January 2010.
50% of this quantity (60 MW) will be allocated by HTSO on daily auctions in accordance with HTSO auction rules. |
|
05-01-2010 |
Announcement for the Increase of NTC value for the period 11 – 17 January 2010 on the interconnection of MEPSO
---------------------------------------------
In accordance to the New calculations of the NTC for the direction MEPSO to HTSO its value is increased by 160 MW for the period 11 – 17 January 2010.
50% of this quantity 80 MW will be allocated by HTSO on daily auctions in accordance with HTSO auction rules. |
|
29-12-2009 |
Announcement for the Increase of NTC value for the period 1 – 31 January 2010 on the interconnection of Albania
---------------------------------------------
In accordance to the New calculations of the NTC for the direction OST to HTSO its value is increased by 200 MW for the period 1 – 31 January 2010.
50% of this quantity 100 MW will be allocated by HTSO on daily auctions in accordance with HTSO auction rules. |
|
24-12-2009 |
Announcement for the Increase of NTC value for the period 1 – 10 January 2009 on the interconnection of FYROM
---------------------------------------------
In accordance with the weekly calculations of the NTC for the direction MEPSO -> HTSO its value is increased by 120 MW for the period 1 – 10 January 2009.
50% of this quantity (60 MW) will be allocated by HTSO on daily physical transmission rights auctions in accordance with HTSO auction rules. |
|
22-12-2009 |
Referring to the “Access rules to France-Italy, Switzerland-Italy, Austria-Italy, Slovenia-Italy, Greece-Italy Interconnections (Capacity Allocation Auction Rules) 2010”, we inform market participants that the final version of Auction Rules for the year 2010 is approved by the relative Regulators. |
|
22-12-2009 |
Referring to: Announcement of Yearly Auction for the Year 2010, as regards the allocation of Physical Transmission Rights, for imports at the interconnections of: Greece-Albania, Greece-FYROM and Greece- Bulgaria, for the time interval from 00:00 CET of 01-01-2010 until 24:00 CET of 31-12-2010.
More >>
And to Announcement of Yearly Auction for the Year 2010, as regards the allocation of Physical Transmission Rights, for exports at the interconnections of: Greece- Albania, Greece- FYROM, Greece- Bulgaria and Greece-Italy, for the time interval from 00:00 CET of 01-01-2010 until 24:00 CET of 31-12-2010.
More >>
The Announcements of Yearly Auctions for the Year 2010 as regards imports and exports in the Greek Interconnections are available in HTSOs website. As per the terms of the Auction Rules we hereby publish the Auction Specifications. |
|
16-12-2009 |
Referring to the Access Rules to Greece-Bulgaria, Greece-FYROM, Greece-Albania Interconnections, we inform market participants that the final version of the Auction Rules for the year 2010 is available. |
|
09-12-2009 |
Announcement for the Increase of NTC value for the period 14 – 20 December 2009 on the interconnection of FYROM
---------------------------------------------
In accordance with the weekly calculations of the NTC for the direction MEPSO -> HTSO its value is increased by 120 MW for the period 14– 20 December 2009.
50% of this quantity (60 MW) will be allocated by HTSO on daily physical transmission rights auctions in accordance with HTSO auction rules. |
|
03-12-2009 |
Announcement for the Increase of NTC value for the period 7 – 31 December 2009 on the interconnection of BULGARIA
---------------------------------------------
In accordance with the weekly calculations of the NTC for the direction BULGARIA -> HTSO its value is increased by 100 MW for the period 7 – 31 December 2009.
50% of this quantity (50 MW) will be allocated by HTSO on daily physical transmission rights auctions in accordance with HTSO auction rules. |